HPAC - Removal/Install/Testing

Agency: DEPT OF DEFENSE
Level of Government: Federal
Category:
  • 43 - Pumps and Compressors
Opps ID: NBD00159910497469977
Posted Date: Mar 1, 2023
Due Date: Mar 6, 2023
Solicitation No: N3904023Q0085-1
Source: https://sam.gov/opp/32aec2cb57...
Follow
HPAC - Removal/Install/Testing
Active
Contract Opportunity
Notice ID
N3904023Q0085-1
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE NAVY
Major Command
NAVSEA
Sub Command
NAVSEA SHIPYARD
Office
PORTSMOUTH NAVAL SHIPYARD GF
Looking for contract opportunity help?

Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.

General Information
  • Contract Opportunity Type: Sources Sought (Original)
  • All Dates/Times are: (UTC-05:00) EASTERN STANDARD TIME, NEW YORK, USA
  • Original Published Date: Mar 01, 2023 11:33 am EST
  • Original Response Date: Mar 06, 2023 12:00 am EST
  • Inactive Policy: Manual
  • Original Inactive Date: Mar 09, 2023
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: 4310 - COMPRESSORS AND VACUUM PUMPS
  • NAICS Code:
    • 332912 - Fluid Power Valve and Hose Fitting Manufacturing
  • Place of Performance:
    Kittery , ME 03904
    USA
Description

This is a sources sought notice only. No solicitation is being issued at this time. This notice is issued for the purpose of market research in accordance with Federal Acquisition Regulation (FAR) Part 10. Please do not submit price quotations at this time. The issuance of this sources sought notice does not commit The Government to issue a solicitation or ultimately award a contract or purchase order for this requirement.The Government is not liable to pay for or reimburse any companies or entities that respond to this announcement for any costs incurred for preparing responses to this notice. The Portsmouth Naval Shipyard is seeking sources who may potentially have the ability to fulfill a lodging requirement, near Kittery, ME. for the below rooms during the period of performance that can meet the below specification.





Removal/Install/Testing of HPAC:



Task Period of Performance



Removal 9/1/2023-12/1/2023



Install 2/1/2025 - 5/1/2025



Testing 8/1/2025 - 10/1/2025












  1. SCOPE





STATEMENT OF WORK








    1. Title: Contractor shall provide services to assist Portsmouth Naval Shipyard (PNS) with replacement and testing of a Virginia Class Submarine High Pressure Air Compressors (HPACs) in accordance with NAVSEA technical requirements.


      1. Unless indicated otherwise in this SOW, the Contractor shall provide all equipment, tools, materials/parts, consumables, PPE, and other items/services necessary to perform the work as specified.







Location of Work: Portsmouth Naval Shipyard






    1. Identification: RIX Model 5R5-75B HPAC, supplied by the Advance Equipment Repair Program (AERP).








  1. REFERENCES








    1. Submarine Maintenance Standard 5510-081-215, latest Rev/Chg










    1. Technical Manual S9550-CR-MMA-010, latest Rev/Chg










    1. HM&E Test Procedure 55150-3-7686, latest Rev/Chg










    1. Work & Test Manual, latest Rev/Chg










    1. Off-Yard Work & Test Manual, latest Rev/Chg










    1. Standard Item 009-90 Technical Representative; provide








  1. REQUIREMENTS








    1. Contractor shall remove existing Model 5R5-75B HPACs installed shipboard. Disassembly and reassembly will be required to facilitate offloading. Work will be in accordance with reference 2.1.












      1. Contractor shall provide all components and soft goods required for disassembly.














      1. Contractor shall provide technical recommendations to PNS Engineers for PNS work to disconnect ship’s electrical and fluid / mechanical systems to HPACs.












    1. Contractor shall install AERP program supplied replacement Model 5R5-75B with PLC HPACs. Disassembly and reassembly will be required to facilitate on loading. Work will be in accordance with reference 2.1.












      1. Contractor shall provide all components and soft goods required for reassembly.














      1. Contractor shall provide technical recommendations to PNS Engineers for PNS work to reconnect ship’s electrical and fluid / mechanical systems to HPACs.














      1. Contractor shall conduct satisfactory start up, operation, and testing of replacement HPACs in accordance with reference 2.3.

      2. Contractor shall provide necessary repair services and repair parts to correct deficiencies identified during testing of newly installed HPACs.














      1. Vendor shall verify set points and calibration of valves and instrumentation as required in accordance with references 2.1 and 2.2.














      1. Vendor shall verify that instrumentation calibration dates are not to expire prior to the PNS availability completion date plus 90 days.














      1. Contractor shall provide technical guidance to PNS personnel for operation and maintenance requirements for remainder of availability.










  1. OTHER REQUIREMENTS








    1. Contractor personnel assigned to this work must be briefed on all procedures, safety precautions, and technical aspects of applicable PNS instructions such reference 2.4 and 2.5.










    1. Contractor personnel shall provide and use all personal protective equipment (PPE) required by PNS.










    1. Contractor personnel will participate in pre-shift briefings as directed by PNS.










    1. Contractor operating procedures are subject to review by the PNS Occupational Safety and Health Office and Naval Base local authorities.










    1. PNS shall provide a copy of reference 2.3 to the contractor for review. A non-classified system diagram of the ships high pressure air system shall be provided to the contractor by PNS for information.










    1. PNS shall de-energize, de-pressurize, and lock-out/tag-out the HPACs prior to contractor commencing shipboard work.










    1. PNS shall provide necessary fluids required to refill and operate the HPACs, such as lubricating oil, coolant, additives, etc.










    1. The contractor shall drain and refill all fluids from the existing and replacement HPACs as necessary to safely handle and transport.










    1. The contractor shall ensure that all hazardous materials generated are turned over to PNS for disposal.










    1. The use of mercury, mercury containing compounds, mercury containing equipment, and/or instruments containing mercury is prohibited.










    1. PNS shall dispose of all hazardous materials generated by the contactor during execution of this contract.










    1. The contractor shall break and remake all HPAC mechanical piping joints required to permit rigging and removal/installation.












      1. The contractor shall identify any such joints to PNS in writing.












    1. The contractor shall disconnect and reconnect all HPAC wiring and cable connections required to permit rigging and removal/installation.












      1. The contractor shall identify any such wiring and cable connections to PNS in writing.












    1. PNS shall cut and refabricate all HPAC component welded piping joints required to permit rigging and removal/installation.










    1. PNS shall provide all rigging services.










    1. The contractor shall dispose of all non-hazardous contractor generated trade litter.










    1. The contractor shall provide communications equipment between off hull and in- hull work locations.










    1. PNS shall make all connections and removals from the Ship’s System as required.










    1. PNS shall break and remake all connections to ship’s systems.










    1. PNS shall complete all associated tests prerequisite to reference 2.3.










    1. PNS will accomplish valve lineups of ship’s system valves.










    1. The contractor shall provide equipment to contain mechanical joints to avoid leakage onto or into the ship, dry-dock, or surrounding environment.










    1. The contractor shall accommodate machinery mount replacement by PNS personnel during installation of AERP asset.










    1. PNS shall replace any associated machinery mounts as required by the Availability Work Package (AWP).










    1. PNS shall accomplish all insulation resistance checks between the interconnected motors and controllers in accordance with reference 2.3.










    1. PNS shall establish, maintain, and adjust cooling water supply to the HPACs as required by the HM&E Test Procedure.










    1. PNS shall establish, maintain, and adjust the 700 psi air supply required for startup of the HPACs.










    1. PNS shall establish and maintain proper ships ventilation and hull openings to prevent pulling vacuum in the engine room during HPAC operational testing.








  1. NOTES








    1. PNS shall crate and ship offloaded HPACs to AER Program refurbishment destination.










    1. PNS shall receive HPACs from AER Program and provide to contractor.










    1. Growth in scope of work is possible.








  1. GOVERNMENT FURNISHED MATERIAL





TOTAL QTY. PROVIDED



NAME OF PART



PIECE NO.



REF. NO.



NATIONAL STOCK NO.



NOTES




Attachments/Links
Contact Information
Contracting Office Address
  • PORTSMOUTH NH 03801-5000
  • PORTSMOUTH , NH 03801-5000
  • USA
Primary Point of Contact
Secondary Point of Contact


History
  • Mar 01, 2023 11:33 am ESTSources Sought (Original)